EPA provides update on Cabot/Koppers Superfund Site: next phase will involve removing trees

Cabot/Koppers Superfund Site

BY JENNIFER CABRERA

GAINESVILLE, Fla. – At the October 8 General Policy Committee meeting, the Gainesville City Commission heard an update on the remediation of the Cabot/Koppers Superfund Site; the EPA said the next phase will include removing a large number of trees.

Megan Arias, the EPA’s Remedial Project Manager for the site, showed a map of the three main areas, with NW 6th Street along the western border and NW 23rd Avenue along the southern border; she said her update would focus on the yellow and blue areas. 

The three main areas on the site

The site became contaminated from wood-treating operations that began in 1916 and continued until late 2009, and contaminants include polycyclic aromatic hydrocarbons, benzene, pentachlorophenol, certain metals, and dioxin.

Next steps

Beginning in mid-October, a 5,300-foot-long cut-off wall will be constructed on the Koppers site, extending approximately 65 feet into the ground, to contain contaminated groundwater. An existing stormwater ditch will be replaced with a new piping system that goes around the cut-off wall, and soil will be removed from the City’s former Municipal Storage Yard (the area in blue) and relocated to a soil consolidation area.

Advertisement

The diagram below shows the cut-off wall in purple, the existing stormwater ditch with a dotted black line, and the new piping system with a dotted blue line.

Upcoming work on the site (click to enlarge)

“Pretty much everything under the yellow” will be cleared

Arias said, “Unfortunately, there has to be some tree clearing, and that’s the yellow.” She said there would also be some tree-clearing in the blue area and added, “The people who live closest by it are going to notice the tree-clearing and might be disturbed by the tree-clearing, so we just want to let the public know.” She said the trees to be cleared would be “pretty much everything under the yellow.”

Arias said an impermeable cover will eventually be placed over the whole area enclosed by the cut-off wall “so that the groundwater can’t run through that area,” and soil and grass will be planted over it. She added that the site is being restored to commercial and industrial standards, and there will be a restrictive covenant that prohibits the site from ever being residential.

Open house on October 21

Arias said there will be an open house for anyone who is interested in the project on October 21, from 5 p.m. to 7 p.m., at 200 NW 23rd Avenue. She said that residents who live immediately adjacent to the site “will likely notice the remediation activities, including vegetation clearing and heavy machinery.”